低水头航运枢纽工程施工导流方案风险决策方法  

Risk Decision-making of River Diversion Schemes for Low-head Navigation Junction

在线阅读下载全文

作  者:金凤[1] 黄贵标[1] 金平平[1] 

机构地区:[1]江苏科技大学船舶与海洋工程学院,江苏镇江212003

出  处:《水运工程》2006年第9期42-46,共5页Port & Waterway Engineering

摘  要:根据低水头航运枢纽工程施工导流的特点,分析了影响低水头航运枢纽工程施工导流方案优选的6个主要指标,建立了导流方案风险决策模型。模型中以区间数的形式来表示决策信息,运用了区间数相离度概念来计算各指标的权重大小,并采用多属性决策模型的投影排序方法进行优选。株洲航电枢纽实例验证了该方法的可行性,分析结果可以为导流方案选择提供决策支持。According to the characteristics of diversion construction of low-head navigation junction, this paper analyzes the 6 major factors affecting the scheme decision of diversion, and establishes risk decision model of diversion scheme, in which attribute value is expressed with the fi)rm of interval number, weight is calculated with the concept of deviation degree of intervals, and projection ranking method of Multiple Attribute Decision Making model is adopted to reach the better choice. This model is proved feasible with Zhuzhou navigation junction, and the result may serve as a support for scheme decision.

关 键 词:航运枢纽 施工导流 风险决策 决策模型 

分 类 号:U655.1[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象