检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市隧道工程轨道交通设计研究院,上海200070
出 处:《岩土工程学报》2006年第B11期1411-1414,共4页Chinese Journal of Geotechnical Engineering
摘 要:城市地下工程活动中,在已有的地铁车站周围进行深基坑开挖问题是一项难度较高的工程。当基坑必须与既有车站共用一幅连续墙,并且开挖深度比既有车站更深时,工程难度更高。通过建立三维板壳有限元模型,分析该类基坑开挖对既有车站结构内力的影响,讨论了基坑开挖对既有车站共用墙体和车站内顶、中、底板的内力影响,得到了一些内力变化规律。During the construction of underground work in cities, it is a difficult project that the excavation of a pit is close to an existing metro station. When the pit has to use a common wall of the station as supporting structure and is deeper than the underground metro station, the project is more difficult. By three-dimension shell finite element, the influence of a pit excavation on the internal forces of an existing metro station was analyzed. For the common diaphragm walls of the existing metro station and the newly built pit, the variety of bending forces was discussed. And the internal force variety of the floors in the existing metro station was also discussed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229