检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南林学院,云南昆明650224
出 处:《资源开发与市场》2007年第3期224-226,共3页Resource Development & Market
基 金:国家重点基础研究发展计划(973计划):纵向岭谷区生态系统变化及西南跨境生态安全项目(编号:2003CB415100)资助
摘 要:环境影响评价分为规划环境影响评价和建设项目环境影响评价。由于两种环境评价类型的发展情况不同,其生物多样性影响评价的发展情况也有所不同。根据其特点概括分析了生物多样性影响评价的现状,包括评价原则和评价方法,指出不足之处,并初步提出了评价指标的筛选。Environmental impact assessment included environmental impact assessment for plan/program and environmental impact assessment for construction, With the different developing level of two types, biodiversity impact assessment were also different for two aims.Based on the characteristics, this paper analyzed current situation of biodiversity impact assessment, including the principles and methods, then pointed out their deficiencies, and put forward a preliminary screening method of evaluations.
分 类 号:X17[环境科学与工程—环境科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63