原生矿柱浸中铜的浸出率灰色预测  被引量:3

Grey Forecasting Model of Copper Extraction Rate of Primary Ore with Column Leaching

在线阅读下载全文

作  者:江怀春[1] 吴爱祥[1] 王贻明[1] 滕炳娟 

机构地区:[1]中南大学资源与安全工程学院 [2]山东黄金集团有限公司三山岛金矿

出  处:《矿业快报》2007年第1期13-15,共3页Express Information of Mining Industry

基  金:973国家重点基础研究发展规划项目(2004CB619200);国家创新群体项目(50321402);国家杰出青年基金项目(50325415)

摘  要:讨论了灰色预测模型在原生矿浸出预测中的应用。基于灰色预测理论建立了GM(1,1)模型,并叙述了运用GM(1,1)模型进行预测的详细步骤,并以预测室内柱浸试验的浸出率为例进行了实际应用,最后用“残差大小检验法”和“均方差比值检验法”对预测结果进行了检验。结果表明:模型预测值与试验测试值吻合较好。The application of the grey forecasting model in predicting extraction rate of primary ore was discussed. The GM ( 1,1 ) model was established by using the gray forecasting theory and the detailed steps to carry out prediction by the model were described. Taking for example the extraction rate of a laboratory column leaching test, the actual application was carried out. The "residual test method" and the "mean variance ratio test method were used for checking. The results show that the forecasting value coincides with the experimental value.

关 键 词:柱浸 浸出率 灰色预测 GM(1 1)模型 预测精度 

分 类 号:TF811[冶金工程—有色金属冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象