检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁四局集团有限公司技术中心,合肥230023 [2]中铁四局集团第六工程公司,安徽芜湖241000
出 处:《建筑技术开发》2007年第2期58-61,共4页Building Technology Development
摘 要:柳州三门江大桥主桥为(100+160+100)m 双塔双索面三跨部分斜拉预应力混凝土箱梁桥,桥面宽41m,居同类型桥梁国内第一。介绍该桥悬臂施工中采用的控制方法和施工控制主要内容,重点介绍了施工过程中主梁变形、斜拉索索力的测试和控制及主梁截面应力、索塔变形的监测。工程实践表明,该施工控制方法合理,取得了满意的控制结果,为同类型桥梁的施工控制提供了参考。The main bridge of Sanmenjiang bridge in Liuzhou, 100 + 160 + 100 m in length, is a 3-span partial cable - stayed prestressed concrete box beam bridge with two pylons and double cable planes. Its width is 41 m. This width is the widest in China among the same kind of bridges. This paper presents methods and main contents of construction control for the bridge during cantilever construction, and puts emphases ~n test and control of Order deformation and cable force, surveillance of girder section stress and pylon deformation during construction process. This practice of engineering proved this construction control method was reasonable, control results were satisfactory. The experience can be referred by similar bridge construction control.
分 类 号:U448.27[建筑科学—桥梁与隧道工程] U445.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48