检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张水宾[1] 岳丰田[1] 朱学银[1] 熊旺[1]
机构地区:[1]中国矿业大学建筑工程学院,江苏徐州221008
出 处:《中国市政工程》2007年第1期88-90,共3页China Municipal Engineering
摘 要:以某超大型盾构出洞冻结法施工中的地下连续墙监测为例,介绍了盾构出洞过程中地下连续墙所受冻胀压力、顶端水平位移和相对弯曲变形的监测方法。通过现场实测数据分析,证明用实时监测方法调整冻结和洞门凿除施工可保证盾构安全顺利出洞。Taking underground continuous wall monitoring in an outer well construction of large diameter shield by artificial ground freezing method, the monitoring methods of the frost-heave pressure on underground continuous wall, the displacement at the top and the relative distortion of underground continuous wall in the outer well construction by freezing method are introduced. It is shown that regulating the work of freezing and digging in tunnel portal by field monitoring guarantee the security of outer well construction.
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222