盾构出洞冻结法施工中的地下连续墙监测  被引量:1

Underground Continuous Wall Monitoring of Shield Tunneling by Artificial Ground Freezing Method

在线阅读下载全文

作  者:张水宾[1] 岳丰田[1] 朱学银[1] 熊旺[1] 

机构地区:[1]中国矿业大学建筑工程学院,江苏徐州221008

出  处:《中国市政工程》2007年第1期88-90,共3页China Municipal Engineering

摘  要:以某超大型盾构出洞冻结法施工中的地下连续墙监测为例,介绍了盾构出洞过程中地下连续墙所受冻胀压力、顶端水平位移和相对弯曲变形的监测方法。通过现场实测数据分析,证明用实时监测方法调整冻结和洞门凿除施工可保证盾构安全顺利出洞。Taking underground continuous wall monitoring in an outer well construction of large diameter shield by artificial ground freezing method, the monitoring methods of the frost-heave pressure on underground continuous wall, the displacement at the top and the relative distortion of underground continuous wall in the outer well construction by freezing method are introduced. It is shown that regulating the work of freezing and digging in tunnel portal by field monitoring guarantee the security of outer well construction.

关 键 词:冻结加固 盾构出洞 地下连续墙监测 

分 类 号:U455.49[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象