检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《运筹与管理》2007年第1期76-81,共6页Operations Research and Management Science
基 金:国家自然科学基金海外杰出青年基金B类项目(70028102);国家自然科学基金重大项目(59990470-4)
摘 要:针对可控提前期领域现有研究中存在的不足,提出了同时考虑可控提前期和缺货对押后订单比例影响的连续盘点库存管理问题。在市场需求服从正态分布条件下建立年总成本表达式,并同时决策订货量、订货点和提前期使年总成本最小。实例计算表明我们的库存管理方法可以减少总成本,提高顾客服务水平和使库存管理更加平稳。According to the defects of the researches dealing with controllable lead time, the authors present a continuous review inventory model with controllable lead time, considering the impact of lost sale on backorder rate. We build the expression of total expected annual cost when the demand is normal distribution, simultaneous order quantity, order point and lead time to minimize the total expected annual cost. Numerical examples indicate our inventory policy can lower the total inventory cost, improve the service level and smooth the inventory management.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143