基于蚁群算法的施工项目工期-成本优化  被引量:30

Time-Cost Trade-Off of Construction Project based on Ant Colony Algorithm

在线阅读下载全文

作  者:熊鹰[1] 匡亚萍[2] 

机构地区:[1]北京交通大学经济管理学院,北京100044 [2]浙江大学建筑工程学院,杭州310027

出  处:《系统工程理论与实践》2007年第3期105-111,共7页Systems Engineering-Theory & Practice

摘  要:工期-成本优化是施工项目计划的一个重要方面.它从实质上属于一类多目标优化问题.结合近年来提出的一种新的进化算法-蚁群算法(ACO),尝试对工期成本问题(TCTP)进行求解.通过与改进自适应权重方法(MAWA)的结合,ACO算法不仅可以找到最优解,还可以得到问题的帕雷托前沿.通过一个算例验证了算法的有效性,并和枚举法和遗传算法的计算结果进行了比较.结果表明蚁群算法对于工期成本优化问题的求解是十分适用的.The time-cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a multi-objective optimization problem. A new evolutionary algorithm-ant colony optimization (ACO) algorithm was employed to solve the time-cost trade-off problem (TCTP). Combining with the modified adaptive weight approach (MAWA), the ACO algorithm can find out the optimal solution, and define the Pareto front as well. To verify the efficiency and performance of the proposed method, a test example was conducted and the results were compared with that of the exhaustive enumeration and the genetic algorithm. The results indicate that the ACO algorithm is much suitable for solving time-cost trade-off problem.

关 键 词:工期成本优化 改进自适应权重 蚁群算法 多目标优化 

分 类 号:O231[理学—运筹学与控制论] TU712[理学—数学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象