检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电科学研究院水力学所,北京100038
出 处:《南水北调与水利科技》2007年第2期6-8,24,共4页South-to-North Water Transfers and Water Science & Technology
基 金:国家自然科学基金项目(59879016)
摘 要:针对南水北调工程的实际情况,提出采用最优控制理论解决调水工程中存在的滞后与耦合问题。通过建立渠道的状态空间方程,将水力学问题转化为控制论问题。建立渠道运行二次性能指标,求解系统最优控制方案。以南水北调中线总干渠京石应急段为例进行仿真计算,结果表明渠道水流在2h内快速达到稳定,水位波动小于0.15m/h,动态稳态性能良好。Based on the conditions of Middle Route of South-North Water Diversion Project, this paper discusses using optimal control theory to solve the problem of time lag and coupling. By deducing the stat-space equation of canal system, the problem of hydraulics is transformed to the problem of control. The linear quadratic index functions are formed and then the optimal control rule is extracted. An example of south-to-north water diversion project is presented to test the controller. The simulation results show that the flow can be steady in 2 hours and the fluctuation is less than 0. 15 meter per hour and the steady and dynamic quality are good.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.235