检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨宗麟[1]
机构地区:[1]华东电网有限公司,上海200002
出 处:《华东电力》2007年第5期63-64,共2页East China Electric Power
摘 要:分析了采用最大3d平均负荷指标对电网运行的经济性和必要性。随着国内电力供需矛盾趋缓,采用最大3d平均负荷作为电网最大负荷的时机已趋成熟,应参照日本等国的经验,尽早采纳该方法。The economy and necessity of using the mean load indice of 3 days with maximum load records as the grid' s maximum load are analyzed. Since the conflict between power demand and supply in China has become eased up, the precondition of adopting the mean load indice of 3 days with maximum load records as the grid's maximum load is mature. It is proposed that the above method which is adopted by some foreign, countries such as Japan should be adopted by China as soon as possible.
分 类 号:TM714[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31