检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家海洋局第一海洋研究所,山东青岛266061
出 处:《海岸工程》2007年第3期47-54,共8页Coastal Engineering
摘 要:陆上勘查孔位海拔高程的测量工作多采用水准高程传递的方法。海上钻探孔位的海拔高程,由于海洋条件限制,此方法并不适合。为了满足近海工程勘察中测量孔位高程的实际需要,本文采用实时动态差分全球定位系统(GPS-RTK)技术和测深技术,组成RTK和测深仪联合作业系统来测量勘查孔位的标高,在实际近海海洋勘查中取得了良好效果,以便促进RTK技术在海洋工程建设中的应用。The leveling elevation transfer method is usually used for measuring the elevation of land exploratory borehole, but this method is inapplicable to the measurement of elevation of offshore borehole due to the limitation of marine conditions. In order to meet the requirements for measuring the elevation of offshore borehole, the combined real time kinematic global positioning system (RTK-GPS) and sounding technology is used to measure the elevation of offshore borehole, and good results have been obtained in applying the combined technology to offshore engineering investigation, which will promote the application of RTK technology in constructing the marine engineering.
分 类 号:P751[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222