检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水文水资源学院,南京210098 [2]浙江水利水电专科学校,杭州310018 [3]江苏省镇江市润州区水利局,镇江212005
出 处:《中国农村水利水电》2007年第10期5-7,共3页China Rural Water and Hydropower
基 金:浙江省自然科学基金资助项目(M503254);浙江省水利厅科技资助项目(RC0604)
摘 要:以姚江大闸和武障河闸为例,对河口水域建闸后的闸下淤积的机理进行了研究。通过应用二维悬沙模型的模拟计算,分析了数学模型在模拟近闸段的淤积时存在的缺陷,对产生问题的原因进行了初步探讨。由于闸下淤积问题存在明显的时空性和区域性特征,应积极研究解决措施。 This paper focuses on sluice sedimentation mechanism after construction of river gate at estuarine areas with case studies of the Yao River and Wuzhang River sluices.2D suspended sediment model is used in this study to simulate and calculate,and the limits of the model in the simulation of the sedimentation near the sluice are also analyzed in the paper.The causes for the problem are preliminarily discussed.Because the sluice sedimentation has special and temporal characteristics,it is necessary to study the countermeasures to solve the problem.
分 类 号:TV66[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3