检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华中科技大学机械学院工业工程系,武汉430074
出 处:《计算机应用研究》2007年第11期185-187,共3页Application Research of Computers
基 金:国家"863"计划资助项目(2005AA411040)
摘 要:由于现行的优化算法在解决模具车间调度问题上存在局限性,目前大部分模具车间由人工编制车间作业计划,导致生产效率较低、物料供应不能同步化等问题。为此,介绍了采用基于组合规则的启发式算法,选择加工时间最短和最小等待时间等规则,解决了现行的优化调度算法在车间调度问题中所遇到的难点。经实例验证获得了较为理想的结果。For the existing scheduling algorithm had some problems in solving modul workshop scheduling problem, modul workshop task plan was usually scheduled by manual work, this lead to low efficiency and material providing confuse. According to this situation, this paper introduced an algorithm based on combinational rule to solve this complicated combining optimization problem. The combinational rule could effectively solve some problems which could not be solved by existing scheduling algorithm. Examples prove the algorithm is effective.
分 类 号:TP311[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.150