检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁隧道集团科学技术研究所,河南洛阳471009 [2]中铁隧道集团,河南洛阳471009
出 处:《土工基础》2007年第5期28-30,42,共4页Soil Engineering and Foundation
摘 要:武汉长江两岸属Ⅰ级阶地,地质条件差,环境复杂,承压水位高,且承压水与长江水有联系。随着基坑开挖深度的增加,降水越来越重要,总结了高承压水软土地区深基坑减压降水的设计与施工技术,并讨论了由于降水引起地表沉降的规律及计算方法。The both banks of Yangtze River in Wuhan are the first terrac, where the geological condition is poor, and the water head of confined aquifer is high and related to Yangtze River. At the same time, the environmental condition of Wuhan nearby the Yangtze river is complex. As the excavation's depth increasing, the design of dewatering and the technology of construction in soft soil region with high water head of confined aquifer are summarized detailedly, then the regulation and calculation of the settlement of the ground surface are discussed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.82.12