既有营运线时速200km无缝提速道岔的铺设技术  

The Laying Technology of Welded Switches of Speed Raising Railways for 200 km/h Existing High-speed Railways

在线阅读下载全文

作  者:李志林[1] 王星华[1] 

机构地区:[1]中南大学土木建筑学院

出  处:《湖南城市学院学报(自然科学版)》2007年第3期22-25,共4页Journal of Hunan City University:Natural Science

摘  要:介绍了浙赣铁路电气化提速改造工程中所应用的12#可动心轨式提速道岔的基本情况,探讨了时速200 km的12#可动心轨式提速道岔组装施工工艺,以及封锁时间内更换道岔施工工艺.12#可动心轨式提速道岔在浙赣铁路电气化提速改造工程得到成功应用,并取得了良好的效果.Firstly, this paper introduces the basic situation of No. 12 raising speed turnout with movable nose frog in the speed-raising project by electrification on Zhe-Gan railway,and then it discusses the assembly and construction technology of No. 12 raising speed turnout with movable nose frog for 200 km/h high-speed railways. And it also introduces the construction technology of the replacement of turnout in using construction blocking time. At the end this paper points out the No.12 raising speed turnouts with movable nose frog are successfully applied in the speed-raising project by electrification on Zhe-Gan railway and obtain good results.

关 键 词:营运铁路 提速道岔 铺设技术 

分 类 号:U213.6[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象