检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽省公路局检测中心,合肥230051 [2]安徽省公路管理局,合肥230026
出 处:《交通科技》2007年第3期8-9,13,共3页Transportation Science & Technology
基 金:交通科技通达计划科研项目(2005-05)
摘 要:对安徽某特大桥基础3根大直径嵌岩桩的现场施工进行了监测,分析了其在施工过程中的承载特性和受力机理等情况。监测结果表明:嵌岩桩的侧摩阻力在加载过程中出现了2个峰值,随着荷载的继续增加,上峰值有增大的趋势。The paper monitored the construction of three large diameter socketd piles of a grand bridge in Anhui province, which includes the load on the pile head, the pile body stress and the pile head settlement and also analyzed the load bearing characteristics and stress mechanism during the construction process. The monitor result indicated that there appeared two peak in the loading process, and the lower peak value had the tendency to increase along with the load increasing.
分 类 号:U445.551[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28