大跨地铁暗挖车站施工地层变位控制技术研究  被引量:3

Research on the soil deformation control in the mining construction of large-span metro station

在线阅读下载全文

作  者:郑良飞[1] 王文正 

机构地区:[1]长安大学,西安710064 [2]北京市政建设集团,北京100045

出  处:《现代隧道技术》2007年第6期18-21,36,共5页Modern Tunnelling Technology

摘  要:在城市中修建地铁暗挖车站,由于开挖跨度大,埋深浅,对地层扰动较大,地表沉降的控制往往成为工程的重点和难点。北京地铁五号线某车站施工时采用数值分析预测、地层变位分部控制,以及信息化施工等措施,成功地将地表沉降控制在设定范围。其研究方法和支护手段,对解决类似大断面暗挖施工具有一定的指导和借鉴意义。When constructing metro station in city soil layers are always disturbed badly because of the large - span and shallow excavation. Accordingly the control of the surface settlements becomes important and difficult. This paper introduces the construction of a station of Beijing metro, in which realized the control of surface settlements within the predetermined range by using the numerical methods of forecasting, controlling by layer, and by monitoring. The research approach adopted by this paper offers certain similar projects. the soil deformation layer guidance and reference to

关 键 词:浅埋暗挖法 地铁车站 变形控制 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象