大断面浅埋暗挖隧道施工引起的地表移动及变形预测  被引量:45

Prediction of ground surface movement and deformation in constructing large cross-section tunnel by shallow-burying and hidden-digging method

在线阅读下载全文

作  者:时亚昕[1] 陶德敬[1] 王明年[1] 

机构地区:[1]西南交通大学土木工程学院,成都610031

出  处:《岩土力学》2008年第2期465-469,474,共6页Rock and Soil Mechanics

摘  要:运用随机介质法理论,研究开发出了隧道施工引起的地表移动及变形预测系统,实现了隧道开挖引起的地表沉降、倾斜、曲率、水平位移和水平变形预测,并对预测公式进行改进,预测了大断面分部开挖引起的地表移动及变形。工程实例分析表明该方法效果良好,具有一定的实用价值。Based on the theory of stochastic medium, a new tunnel movement and deformation prediction software code is developed. And it is used to predict the ground surface settlement, inclination, curvature, lateral movement and lateral deformation due to the tunnel excavation. And through modifying the formula, it can be applied to predicting the ground surface movement and deformation of large cross-section tunnel for staged construction. A case study shows that the prediction method developed can reach good results and has some practical value.

关 键 词:地下工程 随机介质理论 地表移动及变形 

分 类 号:U459[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象