地质偏压隧道松动圈探测与初衬开裂原因分析  被引量:7

Measuring broken rock zone around unsymmetrical-loading tunnel in geologic and analysis the reason of the liner craks

在线阅读下载全文

作  者:姜德义 郑彦奎[1] 任松[1] 郭微[1] 陈玉[1] 

机构地区:[1]重庆大学资源及环境科学学院,重庆400030

出  处:《中国矿业》2008年第1期101-104,共4页China Mining Magazine

基  金:国家自然科学基金重点项目(No.50334060)资助课题

摘  要:根据地质雷达测试隧道围岩松动圈的原理,提出了测试方案,并在共和隧道进行了实测,得出地质偏压隧道围岩松动圈的分布变化规律。结合层状围岩破坏规律和板裂结构理论,得出地质偏压隧道围岩破坏模式和初衬开裂的原因,据此提出相应的治理措施。According to the principle of measuring the broken rock zone (BRZ) with GPR, the method of the measuring of the broken rock zone was proposed. According to the measuring of Gonghe-tunnel, the law of the distribution and vary of broken rock zone of unsymmetrical-tunnel in geologic were obtained. Based on the law of failure of layered rock and the theory of slab-rent structure, the failure model of the rock of unsymmetrical-tunnel in geologic and the reason of the failure of liner were worked out and the treating measurement was proposed.

关 键 词:偏压隧道 围岩松动圈 初衬开裂 治理措施 

分 类 号:TD327[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象