检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:干昆蓉[1]
出 处:《铁道工程学报》2008年第3期64-67,共4页Journal of Railway Engineering Society
摘 要:研究目的:高速铁路的修建涉及大量深埋长隧道,施工阶段围岩详细分级时,涉及到一些在对原围岩分级进行修正时的问题,其中,高地应力、高水压的修正是主要要内容。研究结果:提出了高水压下围岩级别的修正,采用[Q]=[BQ]Jw(Jw=0.1~0.05)对基本分级进行修正;TB法在地应力等级划分标准值附近将产生较大的定级误差,现场地应力评价指标研究及其现场获取技术研究是进行施工阶段围岩分级地应力修正的一个有效途径。Research purposes: A large number of large deep - buried tunnels are to be built for construction of high - speed railways. It is necessary to modify the original grades of some surround rock in the detailed grade determination of the surrounding rock during the construction. The modification of the highland stress and high water pressure is the dominant content of the modification. Research results: The basic grades of surrounding rock under high water pressures can be modified by adopting [ Q ] = [ BQ ] Jw (Jw = 0. 1 ~ 0.05 ). Serious grade differences may occur near the standard values in the determination of the of the surrounding rock in the construction.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28