超大跨径斜拉桥索塔施工期间风险评估与风险管理  被引量:18

Risk Assessment and Risk Management in Construction of Pylon of a Very Long Span Cable-Stayed Bridge

在线阅读下载全文

作  者:阮欣[1] 陈艾荣[1] 欧阳效勇 张建军 

机构地区:[1]同济大学桥梁工程系,上海200092 [2]中交集团第二公路工程局,陕西西安710065

出  处:《桥梁建设》2008年第2期74-77,共4页Bridge Construction

基  金:交通部西部交通建设科技项目“桥梁工程全寿命设计理论与方法”(200431882225)

摘  要:对苏通大桥高桥塔施工全过程中可能影响施工安全、质量和进度的各种不利因素进行风险评估,对各种风险事态提出控制对策,制定风险预案,编写风险管理手册,从而整合形成完整的风险管理系统,指导具体施工。研究成果在苏通大桥工程中得到成功应用。The risks of various adverse factors that may have influence on the safety, quality and progress of the whole construction process of the high-rise pylon of Sutong Bridge are assessed. Accordingly, the control measures against the various risk events are put forward, the risk alarm schemes are formulated and the risk management handbooks are prepared. Asaresult, a set of the complete risk management system for the pylon is finally formed for guidance of the specific construction. The research findings as presented in the paper were successfully used in the construction of the Bridge

关 键 词:风险管理 风险评估 斜拉桥 索塔 施工 

分 类 号:U445.1[建筑科学—桥梁与隧道工程] U443.38[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象