检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北建设勘察研究院有限公司,河北石家庄050031 [2]北京交通大学土木建筑工程学院,北京100044
出 处:《探矿工程(岩土钻掘工程)》2008年第5期72-76,共5页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:基于乌鞘岭隧道几种典型断面优化的结果,运用有限差分程序FLAC3D,对支护结构的锚杆参数进一步进行优化,包括锚杆的最优长度、横向间距和纵向间距等。研究表明,隧道的拱顶下沉量随锚杆长度的增加而逐渐减小。隧道的拱顶下沉量和墙腰收敛值随锚杆横向间距或者纵向间距的增加而增大,而且当锚杆横向间距超过0.8m或者纵向间距超过1 m后,锚杆的作用就不明显了。Based on the optimized cross-section shapes of Wushaoling tunnel, the optimization parameters of anchor are analyzed by the finite difference procedure of FLAC^3D. These parameters include the optimized length of anchor and the spacing between anchors in length and width of the tunnel. Studies show that the settlement at the arch top of the tunnel decreases with the increase of the lengths of anchors, the settlement at the arch top and horizontal displacement at the side of the tunnel increases with the increase of the spacing between anchors in length and width. Furthermore, the effects of anchor would be destructed when the spacing is greater than 0.8m in width and lm in length.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104