检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安交通大学系统工程研究所 [2]山西电力职工大学
出 处:《西安工业学院学报》1997年第4期272-277,共6页Journal of Xi'an Institute of Technology
摘 要:考虑了柔性制造系统(FMS)中的一类调度问题,其目标是极小化一个加工作业集的加权平方tardines和.由于物料传送系统同时只能最多处理固定数量的加工作业,使得问题变得比一般jobshop问题更为复杂.本文提出了一种基于拉氏松弛的算法,借助该算法不仅能求得满意的次优解,而且能对解的次优性做出定量评估.计算实验验证了这种算法的有效性.This paper considers a kind of production scheduling problem in Flexible Manufacturing System(FMS),with weighted quadratic tardiness criterion. Because of the total numbers limitation of processing jobs which the transport system can handle simultaneously,the above problem becomes more complex than the normal job shop scheduling problem. this paper does not only proposes a solution to solve this problem,but also evaluates its suboptimality.Finally numerical experiments verify our methods efficiency,which show that it can obtain stable suboptimal schedules with high quality,and can easily answer so called “whatif” problem.
分 类 号:TH165[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.97