检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]哈尔滨工业大学管理学院,黑龙江哈尔滨150001
出 处:《建筑管理现代化》2008年第3期19-21,共3页Construction Management Modernization
摘 要:平衡记分卡BSC(the Balanced Scorecard)的核心思想就是通过财务、客户、内部经营过程、学习与成长方面的指标之间相互驱动的因果关系,展现组织的战略轨迹,实现绩效考核与绩效改进,以及战略实施与战略修正的目标。结合建筑企业的特点,分析了BSC在建筑企业战略管理中存在的主要障碍,研究了建筑企业实施BSC战略管理系统需要重视的问题,构建了建筑企业实施BSC的指标体系。The core-thinking of BSC is to show the strategy route of the organization by the cause-and-effect links between the four perspectives-Financial, Customers, Internal Business Progress, Learning and Growth-to achieve the goals of performance assessing-proformance improving and strategy impelementing -strategy amending.-Linking to the charactors of the construction enterprises, the main obstacles are analyzed in operating the strategies, the improtant problems in the four perspectives are studied in operating strategy management based on BSC, and the indicates system of BSC is built in construcion enterprises.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188