京津客运专线悬浇连续梁桥面平整度控制技术  

The Deck Level-controlling Technique for the Cantilever-cast Continuous Girder Bridge of the Beijing-Tianjin Inter-municipal Passengers-oriented Railway

在线阅读下载全文

作  者:郑青松 欧阳旋宇 曾清生 

机构地区:[1]中铁十七局集团第六工程有限公司,福建福州350011

出  处:《国防交通工程与技术》2008年第4期70-72,共3页Traffic Engineering and Technology for National Defence

摘  要:结合京津客运专线悬臂浇筑连续梁的施工过程,介绍了主梁的整体线形及各节段间的接缝控制和桥面横向六面排水坡等平整度控制内容,对全桥合拢后桥面的平整度缺陷处理方法进行了阐述,对今后悬浇连续梁施工中的桥面平整度控制与处理有一定的借鉴作用。With the construction process of the project of the cantilever-cast continuous girder of the Beijing-Tianjin Inter-municipal Passengers oriented Railway as a practical example, the linearity control of the whole standing girder, the joint control of different sections, the level control of the tranverse draining slope, etc. , are introduced in the paper, with the methods to deal with errors in deck levelness after all the bridge sections meet each other presented, which may serve as a useful reference for the deck level control and treatment in other similar projects.

关 键 词:悬浇连续梁 平整度 线形控制 接缝处理 桥面横坡 无砟轨道 

分 类 号:U448.215[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象