机构地区:[1]南京水利科学研究院河港研究所
出 处:《水利水运科学研究》1997年第1期24-31,共8页
摘 要:电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。基于实测资料,分析了广东第三核电站沙环站址海区的波浪场、潮流场及水体含沙量场,并结合电站的取水布置特点,对取水渠及其它有关水域回淤进行了分析计算,预测了不同区位的回淤强度。分析表明,取水口取水并不会引起取水渠回淤增加。If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant. Based on field data, the wave field, tidal current field and sand concentraction at the sea area of Shahuan site of the third nuclear power plant of Gangdong province, were analyzed. Combined with the characteristics of the layout of water intake canal and its related water area were carried out. The results expressed that the water inlet will not result in increasing the back silting of intake canal.
分 类 号:TV148[水利工程—水力学及河流动力学] TV671
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15