检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁隧道集团股份有限公司,郑州450003 [2]北京交通大学土木建筑工程学院,北京100044
出 处:《隧道建设》2008年第2期143-147,共5页Tunnel Construction
摘 要:地下水渗涌是影响隧道施工及建成运营的一个重要因素,隧道涌水引起力学、物理和化学作用,并影响围岩水力学和变形特性。隧道涌水将导致强度降低、膨胀、变形,以至于围岩失稳破坏。以长大深埋特长隧道为例,在分析隧道涌水特性的基础上,结合室内试验与现场监测,系统分析隧道涌水对围岩特性的影响,包括强度、围岩变形、膨胀性等。结果表明,隧道涌水量越大、岩体越破碎,其对围岩特性的影响越显著。GIT (groundwater inflow into tunnels ) is one of the important factors that have adverse effects on the construction and operation of tunnels, which can result in mechanical, physical and chemical effects and has impact on the hydro-mechanics and deformation characteristics of the surrounding rock masses. GIT can result in strength reduction, expansion and deformation of the surrounding rock mass, even instability and failure of the surrounding rock masses. Taking super-long tunnels with great covers as example, the authors make systematic analysis on the effects of GIT on the characteristics of the surrounding rock masses, including strength, deformation and expansion characteristics of the surrounding rock masses, on basis of analysis on the characteristics of water inflows and laboratory experiments and field measurements. The conclusion indicates that the larger of the water inflow rates and the worse of the rock masses, the greater the effects on the characteristics of the surrounding rock masses are.
分 类 号:U456.32[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28