检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《筑路机械与施工机械化》2008年第8期72-74,共3页Road Machinery & Construction Mechanization
摘 要:以上中路越江隧道工程从法国布依格公司引进的原用于荷兰"绿心"工程的超大型泥水平衡盾构为例,分析了盾构在推进过程中引起地面沉降的多重因素,并针对这些影响因素,在施工中主要采取了控制盾构切口水压、泥浆性能、同步注浆量和注浆压力的控制以及地面监护等多种措施控制地面沉降,并反馈到信息化动态施工管理中。使地面沉降均控制在设计允许范围内,保证了工程的顺利实施。Based on the practical use in Shangzhong Road river-crossing project of super large slurry balancing shield imported from BOUYGUES of France and used in "Green Core" project of Holland, multiple factors that caused the settlement while pushing forward are analyzed, In order to control the settlement, measures are adopted to control the pressure of edge, performance of slurry, synchronous grouting amount and grouting pressure, The result feedbacks to informationized dynamic construction management, keeping the settlement within allowed range, making sure of the success of construction
关 键 词:超大型泥水平衡盾构 地面沉降 沉降控制 泥浆性能
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222