检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《隧道建设》2008年第4期412-415,共4页Tunnel Construction
摘 要:目前地下结构采用的减震措施主要有2种,即注浆加固和设置减震层。结合雅泸高速公路某隧道,从土-结构相互作用模型出发,运用时程分析方法研究同一地震作用下注浆加固及设置减震层这2种减震措施的地震反应,分析注浆加固范围变化对隧道地震反应的影响,得出这2种措施均可以减小隧道的地震响应,有利于减震。At present, there are two major shock absorption measures for underground structures, i. e. , grouting consolidation and shock absorption cushion. Taking a tunnel on Ya' an-Luzhou highway as example, the authors study on the shock reducing effect of grouting consolidation and shock absorption cushion under the same earthquake action by means of soil-structure interaction model and time-dependent analysis method. The authors also study on the influence of the changing of the grouting consolidation scope on the shock reducing effect. The authors conclude that both these two shock-reducing measures are helpful to reduce the shock response of the tunnels.
分 类 号:U452[建筑科学—桥梁与隧道工程] U457.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249