曲线段桥梁使用主动托换法洞内截桩技术  被引量:2

Technology for Cutting Piles inside Tunnel in Active Underpinning of Pile Foundations of Curvilinear Bridge

在线阅读下载全文

作  者:李春剑[1] 杨勇[2] 李锋[2] 代小勇[2] 

机构地区:[1]中铁隧道集团有限公司科学技术研究所,河南洛阳471009 [2]中铁隧道集团北京分公司,北京100022

出  处:《隧道建设》2008年第4期489-493,共5页Tunnel Construction

摘  要:介绍广州地铁二、八号线桩基主动托换洞内截桩的施工方案。主动托换洞内截桩是桩基托换的一种新做法,吸收了被动桩基托换的部分施工方法,解决了运营中曲线桥梁托换时水平力很难平衡的难题;阐述在动荷载作用下进行桩基托换的施工方法和托换过程中桥梁结构的监控量测;为在复杂结构和地质条件下进行桩基托换积累经验。The construction scheme for the cutting of the piles inside tunnel in the active pile foundation underpinning on Line 2 and Line 8 of Guangzhou Metro is presented. Cutting the piles inside the tunnel in active underpinning is a new approach of pile foundation underpinning, which absorbs some part of the construction methods of the passive pile foundation underpinning. Due to the new underpinning approach, the problem that it is very difficult to balance the horizontal forces during the underpinning of the operating eurvilinear bridge is solved. The construction methods of underpinning under dynamic loading conditions and the monitoring of the bridge structure during underpinning are described. The works practice provides experience for the pile foundation underpinning of complex structures under complex geological conditions in the future.

关 键 词:桩基托换 曲线段桥梁 隧道 监控量测 

分 类 号:U455[建筑科学—桥梁与隧道工程] TU473[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象