检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨英[1]
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《铁道工程学报》2008年第9期77-79,90,共4页Journal of Railway Engineering Society
摘 要:研究目的:大丽铁路三叠系松桂组页岩型隧道具有特定构造环境下的工程条件,破碎页岩遇水软化膨胀等原因易引起初期支护变形,给隧道施工带来较大困难,因此,有必要研究该类围岩特性及隧道施工对策。研究结论:根据页岩(砂质页岩、炭质页岩)的结构特征,提出了相应的施工对策,如对开挖外轮廓进行调整、增大预留变形量、采用三台阶法施工、设置全环工18工字钢架、调整系统锚杆长度、加强监控量测等,这些措施较好地抑制了初期支护变形。Research purposes: There are some speeifieal engineering - geology eonditions on tunnel through shale ( T3s. ) in Dali -Lijiang railway. Due to some peculiar eharaeters of craeked with teetonies and intenerated and inflated with water for shale ( T3sn ), a great deal of difficulties are brought on construction of tunnel. It is necessary to investigate construction countermeasures corresponding shale(T3sn). Research conclusions : Based on the characters of shale ( T3sn ), a lot of construction countermeasures are adopted, including adjustment tunnel profile, accretion premeditate distortion, three -sidestep -diging into, setting steel structure, adjustment length of anchor - pole, strengthening inspection and so on. As a result of above measures, initial stage shoring distortion of tunnel is restrained effectively.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80