检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海交通大学电子信息与电气工程学院,上海200240 [2]英特尔亚太研发有限公司,上海200240
出 处:《计算机辅助工程》2008年第3期72-75,80,共5页Computer Aided Engineering
基 金:国家自然科学基金(60574049);Intel High Volume Manufacturing Research and Consortia/Programs
摘 要:为提高半导体企业的客户服务质量,研究半导体产业多工厂多阶段生产供应链系统和多客户关系、多产品市场环境下的订单承诺(Available-to-Promise,ATP)优化问题.以利润和客户满意度为目标,充分利用半导体产品之间的替代性,建立基于线性规划的高级ATP系统.该系统应用优化软件OPL将模型中的内容转化为OPL语言.仿真实验表明,该方法能帮助半导体企业提高订单响应速度,做出可靠ATP决策.To improve the customer service quality for semiconductor enterprises, the optimization on advanced Available-to-Promise(ATP) system which is based on multi-plant and multi-phrase supply chain system under the multi-customer and multi-product environment is studied. Taking the profit and customer satisfaction as object, the advanced ATP system is developed based on linear programming by taking full advantage of the substitution character among semiconductor products. The system makes use of the optimization software OPL to convert the content of the model into OPL language. The simulation experiment indicates that the method can help semiconductor enterprises to improve order response speed and make reliable decision on ATP .
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.147.65