特大型斜拉桥钢塔柱架设精密测控技术  被引量:4

Precise Surveying Controlling Technology for Erecting Steel Pylons of Oversized Cable Stayed Bridge

在线阅读下载全文

作  者:黄腾[1] 李桂华[1] 陈建华[1] 岳荣花[1] 

机构地区:[1]河海大学土木工程学院,南京210098

出  处:《工程勘察》2008年第12期44-48,52,共6页Geotechnical Investigation & Surveying

摘  要:南京长江第三大桥索塔采用钢结构属国内首创,采用这一新型的建桥技术,对施工测量提出了更高的要求,也给出了一系列新的探索课题。本文以该桥工程建设实例,介绍了钢塔节段制作和架设施工过程中的测量方法及其精度控制措施。实践证明,所采取的测控方法科学、合理,是精密工程测量的一次成功尝试,可为今后类似工程借鉴。The main bridge of No.3 Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. This kind of steel pylon is originated in China. Its new technique requests a higher construction surveying and gives a series of new tasks to survey controlling. This paper, taking this bridge project as an example, introduced the measurement methods and the controlling measures for making and erecting the steel pylons. The practice has verified that the survey controlling methods used in this project is scientific and reasonable. It is a successful trial of precise engineering survey and very instructive for similar project.

关 键 词:钢塔柱 架设 测控 立式匹配 

分 类 号:P258[天文地球—测绘科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象