联拱隧道围岩稳定性与粘弹性分析  被引量:3

Stability and Visco-elastic Analysis of the Surrounding Rock of Bi-arch Tunnel

在线阅读下载全文

作  者:李之达[1] 何巍[1] 覃盛科 李挥 黄方[1] 吴延贞[1] 

机构地区:[1]武汉理工大学交通学院,武汉430063 [2]襄樊市交通规划设计院,襄樊441000

出  处:《交通科技》2008年第6期18-21,共4页Transportation Science & Technology

基  金:国家自然科学基金资助项目(10372074);湖北省交通科技项目(03-66-3/4)

摘  要:结合某联拱隧道现场监测,利用隧道专用软件同济曙光,对联拱隧道施工进行了数值模拟。结果表明:台阶环向土开挖较台阶开挖安全;主洞上下台阶不同步开挖施工是较为合理的施工方案,且模拟和现场测试结果表明按此施工所产生的偏压在允许范围内;而洞周位移数值模拟结果较监测结果偏大,但在允许范围内;洞周位移黏弹性分析表明,隧道在开挖46 d后,其围岩已经稳定,可以进行二次衬砌。In this paper, the dynamical FEM (GeoFBA-V3.0) software was applied to simulate the construction of the hi-arch tunnel combining the monitoring. The results showed that the surrounding excavation is safer than stairs excavation and excavation out of sync between top and bottom stairs is more reasonable than synchronization excavation. Moreover, the simulation and the monitoring showed that the deviation of pressure caused by construction is within allowing range. The simulating surrounding displacement is slightly larger than the monitoring, but it is within allowing range. The visco-elastie analysis about surrounding displacement showed that the surrounding rock of the tunnel will become stability after 46 days and the second support to the surrounding rock of the tunnel can be made.

关 键 词:联拱隧道 数值模拟 稳定性 黏弹性 

分 类 号:U455.4[建筑科学—桥梁与隧道工程] TU457[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象