双侧大腿截肢患者的假肢装配和使用训练  被引量:2

Prosthetic installation and training for the bilateral transfemoral amputation caused by Wenchuan earthquake

在线阅读下载全文

作  者:武继祥[1] 周贤丽[1] 刘青山[1] 汪琴[1] 尹清[1] 林永辉[1] 刘宏亮[1] 吴宗耀[1] 

机构地区:[1]第三军医大学西南医院康复理疗科,重庆400038

出  处:《中华物理医学与康复杂志》2008年第12期830-832,共3页Chinese Journal of Physical Medicine and Rehabilitation

摘  要:目的促进截肢患者早日掌握假肢使用方法。方法对3例截肢患者术后进行系统康复干预,同时针对假肢装配、使用方法进行强化性训练。结果3例截肢患者残肢创面均全部愈合,残肢端呈圆柱状,残肢肌力为5级,残肢髋关节活动范围正常,装配双侧大腿假肢后均取到满意的假肢使用疗效。结论通过进行系统康复治疗、假肢装配及假肢使用训练后,双侧大腿截肢患者均能取得满意假肢使用效果,具有较高的独立生活能力,从而促其早日回归家庭及社会。Objective To help bilateral transfemoral amputee using prosthetic limb early. Methods Three bilateral transfemoral amputees were treated with physical therapy, stump moulding, kinesiotherapy,and prosthetic rehabilitation and installed with prosthetic limbs. Results The stump ulcer healed. The stump shape were cylinder. The muscle strength of stump reached the 5th grade. The range of motion of hip was normal. Three bilateral transfemoral amputees were installed with prosthetic limbs and trained with prosthetic management. Conclusion After systematic rehabilitation, prosthetic installation and training the individuals with bilateral transfemoral amputation can successfully ambulate and independently live.

关 键 词:截肢 假肢 地震 

分 类 号:R687.5[医药卫生—骨科学] R49[医药卫生—外科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象