检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜义欣[1] 汤荣伟[1] 赵鹏飞[1] 肖从真[1] 潘国华[2] 陶勇[2] 阳升[1] 郭占一[2] 李跃林[1]
机构地区:[1]中国建筑科学研究院,北京100013 [2]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《建筑结构》2009年第1期5-7,共3页Building Structure
摘 要:武汉站大跨空间结构体系复杂,以半拱、主拱、斜立柱和V形撑形成的下部结构体系与上部网壳结构互为支撑,成为一个稳定性良好的拱-壳组合体系。该体系中,主拱、半拱等关键构件的计算长度难以用规范和现成的理论来确定。通过屈曲分析,研究了网壳对主拱、半拱稳定性能的影响。针对空间结构支撑体系的屈曲模态不容易确定的缺陷,通过放大荷载,激发主拱、半拱屈曲模态的方法,提出三种确定特殊构件计算长度的方法,为武汉站结构构件设计提供了必要的依据。The structure of Wuhan railway station is a kind of complicated space structure. The interactive system of the grid roof and the main arch or the half arch is studied in detail. The stability of the system is good. However, the effective length of the critical unit, such as the main arch, the half arch, the declining column or the V branch, is decided difficultly. The buckling analysis is used to decided the effective length of the critical unit and the interactive effect of the supported system and the roof is also studied. A kind of effective method is put forward to excite the buckling mode of the arch. Three ways are compared to find the effective length of the critical unit. The result is the essential basis of the design for the critical structure unit.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222