检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁省交通勘测设计院,沈阳110005 [2]辽宁省交通厅基本建设处,沈阳110003
出 处:《北方交通》2009年第2期78-83,共6页Northern Communications
摘 要:如何通过对施工过程的控制,大型桥梁在建成时得到预先设计的应力状态和几何线形,是桥梁施工中非常关键和困难的问题。施工控制有两个方面的主要任务,一是使结构在建成时达到设计所希望的几何形状,二是使结构在建成时达到合理的内力状态,同时在施工过程中保证结构的安全。The control of construction course, the stress state and geometrical linear, which had been designed in advance and have obtained after complete building, are extremely key and difficult issues in construction of bridge. Construction controlling needs fulfiling two main assignments--first is to make structure attain the geometry required by design when bridge has been built completely;Second is to make structure attain rational state of inter- nal force when bridge has been built. In addition, the structure safety must be guaranteed in the construction.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117