检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁隧道集团杭州分公司,杭州211261 [2]浙江华东测绘有限公司,杭州211261
出 处:《隧道建设》2009年第1期105-108,共4页Tunnel Construction
摘 要:主要介绍伊朗TALOON隧道施工测量的全过程,对主要技术环节做了具体的叙述,针对伊朗国内隧道测量放样过程中普遍采用烦琐落后方法的状况,开发了一套基于可编程计算器的断面放样程序,让繁杂的断面放样变得简单易行,同时增加了复核的条件,也减少了放样过程中计算出错的几率;对于在国外隧道施工测量中采用的新技术、新方法做了详细的论述。The complete construction survey process of Taloon Tunnel in Iran is introduced in this paper and the key technology for the tunnel construction survey is described in detail. In order to change the usually adopted backward and complicated methods in tunnel setting-out survey in Iran, a cross-section setting-out survey programme based on programmable calculator is developed. This programme not only simplifies the cross-section setting-out survey process, but also increases some rechecking conditions and reduces the probability of errors in calculation. The new technologies and methods used in tunnel construction survey in foreign countries are also discussed in detail.
分 类 号:U452.13[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145