检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡家范[1,2] 许道化[1,2] 柯弘生[1,2] 徐泽中[3,4] 殷宗泽[3,4] 方涤华[3,4] 张诚厚[3,4]
机构地区:[1]江苏宁沪高速公路股份有限公司 [2]江苏省高速公路建设指挥部 [3]河海大学 [4]南京水利科学研究院
出 处:《水利水电科技进展》1998年第2期1-4,8,共5页Advances in Science and Technology of Water Resources
摘 要:运用更切实际的沉降计算方法,优化软基处理,优化路基施工,用动态控制法确定铺筑路面的时间,科学安排施工,有效地减少工后沉降,使全线软基路段满足设计稳定要求,达到了缩短工期,提高工程质量的目的,为全线一次建成和提前通车提供了保证,并取得节省工程费5000多万元的经济效益。In the light of the results and assessment of the trial section of the Shanghai Nanjing expressway,a practical settlement evaluation method is employed to optimize the soft soil treatment and the subgrade construction.The period for pavement works is determined by the dynamic control method so as to make a rational arrangement for the construction and to control the residual settlements.Thus,the road sections with soft soil foundation reached the required stability and the construction period was shortened,besides,50 million yuan was saved from the project budget.
分 类 号:U412.366[交通运输工程—道路与铁道工程] U416.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117