检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东电网公司,广州510600 [2]华北电力大学,北京102206
出 处:《南方电网技术》2009年第1期16-19,共4页Southern Power System Technology
摘 要:建立基于PMU(phasor measurement unit,相量测量装置)数据的广东电网的实测负荷模型和辨识算法,指出PMU数据处理后用于负荷建模,要满足两个基本条件:一是PMU数据采集地点要装在220kV及以下电压等级的功率受端的纯负荷站点,负荷站出线没有小电源接入;二是PMU数据采集密度达到100Hz/s以上。以广东电网220kV清远变电站为例,通过与系统实际响应的对比分析,验证了负荷模型参数辨识方法的有效性。A PMU (phasor measurement unit) data based load model, which is actually measured in Guangdong Power Grid, and an identification algorithm are established. It is concluded that two basic conditions must be fulfiled for load model building with processed PMU data. One is that the collection site of PMU data must be installed in the pure-load station that accepts power at voltage level of 220 kV or lower, and has no little electrical source connected to its out-lines. The other is that the PMU data collection frequency must be above 100 Hz/s. Taking the 220 kV Qingyuan substatiom in Guangdong Power Grid as an example, the load-model-parameters identification algorithm is validated by comparing with the system's actual response.
分 类 号:TM744[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3