作 者:曾兴昌[1] 栾苏[1] 姚爱华[1] 周忠祥[1] 邓平[1] 杨红刚[1]
机构地区:[1]宝鸡石油机械有限责任公司,陕西宝鸡721000
出 处:《石油矿场机械》2009年第3期54-57,共4页Oil Field Equipment
摘 要:起升特性"偏软"、起下钻过程时间长和效率低是钻机普遍存在的一个问题。如果一味保守地选配大一级的电机和相应的电控系统,又会造成电机功率利用率低的问题。为了定量把握由于速度变化而引起的载荷变化规律,找出最大载荷工况,运用了达朗伯原理、虚功原理和质点系动力学普遍方程,推导了n×(n+1)轮系游车、天车及一级传动绞车系统中电机扭矩TD与顶驱大钩加速度a之间的解析关系式,为选择电机及其控制系统提供依据。Most problem for drilling rig existed, such as weak lifting, long tripping and lower efficiency. A high capacity of motor and the corresponding electronic control system would cause low-rate utilization. In order to quantitatively manage the load changing regularity caused by the velocity changes, to find out the maximum load condition, and to provide a basis for selecting and design the electrical control system, the relationship was deduced between the motor torque of top-drive TD and the acceleration of the hook a about the n× (n+1) gear unit of traveling blockcrown block-drawworks with first stage driving system. In the process, the D'Alembert principle, the principle of virtual works and the particle system dynamics general equation were mainly applied.
分 类 号:TE922[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28