检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒲实[1] 刘俊勇[1] 陈烨[1] 刘友波[1] 魏震波[1] 路志刚[1]
出 处:《四川电力技术》2009年第2期19-23,84,共6页Sichuan Electric Power Technology
基 金:国家重点基础研究发展计划项目(973项目)(2004CB217905)
摘 要:就节能减排下的机组组合问题,通过一价格惩罚因子将传统的双目标优化问题转化为环境约束下的单目标优化问题,提出了求解该问题的二层规划方法。该方法基于二进制编码,通过一种改进蚁群算法选取上层机组的最优启停,并用二次规划处理下层负荷的优化分配。最后,通过6机系统在24小时内的算例仿真验证了该方案的可行性及有效性。The common bi -objective model of the unit commitment problem considering both economic load dispatching and economic emission dispatching can be converted to a single objective optimization by adding a price penalty factor. A bilevel programming method is proposed to solve this environmental constrained problem. Based on a binary coding technique, the upper level optimization of unit status is handled by an improved ant colony algorithm, while the lower level optimization of load dispatching is handled by quadratic programming. Finally, the simulation results of 6 - unit system with a scheduling time horizon of 24 hours demonstrate the feasibility and the effectiveness of the proposed method in solving the environmental constrained unit commitment problem.
分 类 号:TM284[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158