检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]不详 [2]中国交通建设股份有限公司
出 处:《工程机械与维修》2009年第4期39-42,44,共5页Construction Machinery & Maintenance
摘 要:2008年底,铁道部调整了于2004年颁布实施的《中长期铁路网规划》,新增和提前开工一批客运专线和其他等级铁路,我国铁路建设步入了快速发展期。目前,京津城际,石太,武广、合宁客运专线已经投入使用或者即将投入使用。The government has adjusted the long-term plan of railway net to increase and start some high-speed railway and other grades railway ahead of schedule in 2008,which was published in 2004.Chinese railway construction entered the period of fast developing. Nowdays,lots of high-speed railway,such as Beijing-to-Tianjin,Shijiazhuang—Taiyuan, Wuhan—Guangzhou,has gone into or been expected to service.With the construction of high-speed railway in recent years,what is the situation of equipment research and using condition of the common and special equipment in Chinese high-speed railway? How is the using condition to the equipments which has used in 2009 high-speed railway construction? What characteristics of the railway construction will be shown in the future? What kinds of opportunities and challenges are in the construction machinery industry?
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28