检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江大学管理学院,杭州310058
出 处:《计算机应用》2009年第6期1527-1528,1568,共3页journal of Computer Applications
基 金:国家自然科学基金资助项目(70401017)
摘 要:针对软件工程项目调度问题,在考虑加班工时的情况下,提出了柔性工时约束下项目调度问题的数学模型,并设计了相应的蚁群算法。模型对项目人力资源的特殊性进行了分析,指出项目人力资源是一种特殊的可更新资源,在允许加班的情况下,人力资源构成特殊的柔性工时约束。针对所设计的数学模型,在并行项目进度生成机制基础上设计了蚁群算法,并通过算例进行验证与分析。A new mathematical model for software engineering project scheduling was proposed. The model took into consideration the over-time of software engineers, which was regarded as a flexible work-hour constraint. The project human resources were analyzed in detail. As a type of special renewable resource, the human resource was added as a new constraint to the traditional resource constrained project scheduling problem. An ant colony algorithm based on parallel schedule generation scheme was suggested to solve this new flexible work-hour constrained project scheduling problem, and an instance was used to verify and analyze the solution.
分 类 号:TP311.5[自动化与计算机技术—计算机软件与理论] TB114.1[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68