摘  要:针对软件工程项目调度问题,在考虑加班工时的情况下,提出了柔性工时约束下项目调度问题的数学模型,并设计了相应的蚁群算法。模型对项目人力资源的特殊性进行了分析,指出项目人力资源是一种特殊的可更新资源,在允许加班的情况下,人力资源构成特殊的柔性工时约束。针对所设计的数学模型,在并行项目进度生成机制基础上设计了蚁群算法,并通过算例进行验证与分析。A new mathematical model for software engineering project scheduling was proposed. The model took into consideration the over-time of software engineers, which was regarded as a flexible work-hour constraint. The project human resources were analyzed in detail. As a type of special renewable resource, the human resource was added as a new constraint to the traditional resource constrained project scheduling problem. An ant colony algorithm based on parallel schedule generation scheme was suggested to solve this new flexible work-hour constrained project scheduling problem, and an instance was used to verify and analyze the solution.

关 键 词:项目调度 工时约束 蚁群算法 

分 类 号:TP311.5[自动化与计算机技术—计算机软件与理论] TB114.1[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象