检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄牧[1] 戎晓力[1] 梁正央[1] 张毅军[1] HUANG Mu, RONG Xiao-li, LIANG Zheng-yang, ZHANG Yi-jun (Engineering Institute of Corps of Engineers, PLA Univ. of Sci. & Tech., Nanjing 210007, China)
机构地区:[1]解放军理工大学工程兵工程学院,江苏南京210007
出 处:《电脑知识与技术》2009年第5期3557-3559,共3页Computer Knowledge and Technology
摘 要:地下工程沉降数据通常采用分析离散检测点的方法,绘制沉降预警云图,从而对地表的沉降情况进行直观的判断。该文对插值算法进行了比较,采取kriging算法并提出了一种可行性方案。该方案能够利用较少测量点进行插值从而生成一定区域内的彩色沉降预警云图,应用此方案对北京某地铁施工区域进行了沉降预警云图的绘制,Underground engineering analysis of settlement data uses detect discrete point method, rendering the settlement warning cloud, which on the surface for the settlement of intuitive judgments. In this paper, use interpolation algorithm to take kriging algorithm and pre- sents a feasibility plan. The program can make use of fewer measurement points must be interpolated to generate the region early settlement cloud of color, the application of this program on the Beijing subway construction of a regional early warning to the settlement of the drawn image.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30