检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《给水排水》2009年第6期14-17,共4页Water & Wastewater Engineering
摘 要:亚运村供水方式采用饮用水和杂用水两套分质供水系统,规划总用水量为2.2万m3/d,其中饮用水量为1.4万m3/d,杂用水量为0.8万m3/d。饮用水由沙湾新建水厂和南洲水厂提供,并建设饮用水管网。杂用水系统近期采用河水作为水源,远期则以番禺区前锋污水处理厂市政再生水作为水源,并建设杂用水管网。重点介绍了用水量预测和水源选择等规划内容。The water supply system based on different water quality for 2010 (Guangzhou)Asian Games Village is composed of high quality drinking water system and miscellaneous water system. Total predicted water consumption is 22 000 m^3/d, including 14 000 m^3/d high quality drinking water and 8 000 m^3/d miscellaneous water. The high quality drinking water are provided by Sha- wan Water Treatment Plant and Nanzhou Water Treatment Plant, and the miscellaneous water comes from river water in last-period, and from reclaimed wastewater of Qianfeng Wastewater Treatment Plant in Panyu district in long-term. The water supply pipeline of high quality drinking water and miscellaneous water is constructed respectively. The water consumption prediction and plan and selection of water resources are introduced.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117