检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱文展[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《铁道工程学报》2009年第6期9-12,共4页Journal of Railway Engineering Society
摘 要:研究目的:参照同类建设标准项目的运营实践,结合项目工程特点和地质特征,对影响提速的各项关键因素进行分析,提出解决措施和需要深入研究的问题,论证进一步提速的可行性。研究结论:从甬台温铁路建设标准和各项基础设施及配套工程技术措施分析,本线进一步提速在技术上是可行的。通过局部调整道床厚度、变更道砟等级,分析路基工后沉降并采取补强措施后可实现开通运营250 km/h的需求。运输组织和各项工程技术总体上可适应远期提速300 km/h要求,但尚需对运输组织模式、信号区间行车布点等技术进行深入研究和完善。Research purposes: Through reference to the operation practice of similar railway and based on the engineering and geological characteristics of Ningbo - Taizhou - Wenzhou Railway, all influence factors on speed - raise of the railway are analyzed, the measures to be taken and the problems to be studied are offered and the feasibility of further speed - raise of the railway is verified. Research conclusions:Through analyzing the construction standards and technical measures for various infrastructures and auxiliary projects, to further raise the railway speed is feasible. By adjusting partial ballast thickness, improving the grades of ballast and reinforcing the subgrade, the goal of running 250 km/h train can be achieved. On the whole, transportation organization and various engineering technology can adapt to the requirement of running 300 km/h train in future, but transportation pattern and signaling system should be further studied and perfected.
分 类 号:U212[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145