随机双目标焊接车间调度建模与仿真  被引量:3

Modeling and Simulation of Stochastic Double-objective Scheduling Problem in Welding Workshop

在线阅读下载全文

作  者:樊坤[1,2] 张人千[2] 夏国平[2] 

机构地区:[1]北京林业大学经济管理学院,北京100083 [2]北京航空航天大学经济管理学院,北京100083

出  处:《系统仿真学报》2009年第13期3906-3909,3913,共5页Journal of System Simulation

基  金:国家自然科学基金(70871005;70671007);航空科学基金(2007ZG51075)

摘  要:针对一个生产大型机械产品(如架桥机等)的企业的焊接车间的调度问题进行研究,对m位工人加工n个结构件的随机调度问题建立数学模型,并以最小化最大的加工完成时间的期望与方差为优化目标。为求解该模型,对二进制粒子群算法(BPSO)进行改进,并采用动态领域策略、新的粒子个体极值选择以及一维优化方法求解双目标优化问题。通过实例仿真,结果证实修改后的算法是有效的,并能够找到Pareto前沿解。The scheduling problem was based on a real welding workshop in a large manufacturing enterprise. A stochastic scheduling problem consisting of m workers and n jobs was dealt with and a mathematic model was developed to minimize maximum expected value and variance of the completion time. In order to solve the problem, Binary Particle Swarm Optimization (BPSO) algorithm was modified, and a dynamic neighborhood strategy, new particle memory updating, and one-dimension optimization method were used to solve two objectives problem. A simulation example was carried out to illustrate that the improved method could efficiently find Pareto front solutions.

关 键 词:调度 双目标 PARETO 二进制粒子群优化(BPSO) 

分 类 号:F273[经济管理—企业管理] TP391.9[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象