检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交公路规划设计院有限公司,北京市100088 [2]长安大学公路学院,西安市710064
出 处:《公路》2009年第7期102-108,共7页Highway
摘 要:杭州湾大桥中引桥区为70 m预应力混凝土简支转连续箱梁,其整孔预制和海上架设的技术要求高、施工难度大,须对施工过程中的箱梁线形和应力控制进行研究。采用杆系模型计算箱梁预制和施工过程中的应力分布和线形变化,主要分析了收缩徐变对结构线形的影响并简要分析二次张拉对收缩徐变的作用。研究表明,收缩徐变对结构线形的影响不容忽略。并通过实测值和理论值的比较,验证了研究的可靠性,为今后同类桥型施工控制提供参考。The Middle Approach Bridge of Hangzhou Bay Bridge which is 70m P.C. continuous box girder transformed from simple-supported system requires high technique. Its construcnon is realty challenging in pre-fabrication and marine erection, so the research on controlling the geometric and stress of the box girder are needed. Through the finite element model of rod system, the stress distribution and deformation are caculated detailedly, and the action of shrinkage and creep on geometric of the structure and the effect of secondary stretching on shrinkage and creep are analyzed. Numerical results show that the effect of shrinkage and creep on geometrics of the structure can not be ingnored. Through the comparison of the experimental value and the theoretical value ,it has confirmed reliability of the research. It will provide the reference for the future control of the long span bridge construction.
关 键 词:桥梁工程 预应力混凝土箱梁 收缩徐变 二次张拉 桥梁线形
分 类 号:U448.213[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3