BTO供应商的交货期承诺问题研究  被引量:4

A Study on Supplier's Due Date Quotation in Build-to-order Supply Chain

在线阅读下载全文

作  者:许一敏[1,2] 马士华[1] 

机构地区:[1]华中科技大学管理学院,湖北武汉430074 [2]广东工业大学,广东广州510520

出  处:《工业工程与管理》2009年第4期1-5,17,共6页Industrial Engineering and Management

基  金:国家863计划项目(2006AA04Z153);国家自然科学基金项目(70672040)

摘  要:以BTO供应链生产环境为研究背景,在供应商生产能力有限的前提下,对一个由制造商和其上游供应商组成的BTO供应链生产运作系统进行建模,假设该供应链运作系统中各环节均对时间敏感,建立了一个供应商的交货期承诺模型,分析了供应商的服务水平、订单到达率、承诺交货期和总成本之间的关系,得出供应商对制造商的最优承诺交货期,力求最终实现供应链整体成本最小化。With the globalization of market, increasing competition has led companies toward build-to-order (BTO) manufacturing environment with the main characteristic of offering a higher and higher level of customization. To win more customers' orders, these BTO companies must provide competitive delivery lead times and manage to achieve a reliable delivery performance, which are typically as important as competitive prices. To some extend, ensuring a reliable duedate is much more important than giving a low price. Using workload control approach, this article describes how to balance the available production ability and the workload, then proposes a due date quotation model of supplier in build-to-order supply chain. The build-to-order supply chain in the above model is made up of one manufacturer and its upstream supplier on the assumption that every stage in supply chain is time sensitive. The relationship between the supplier' s service level, orders' arriving rate, due date quotation and total cost is also discussed. The optimized due date quotation is provided at last.

关 键 词:交货期预测 BTO供应链 工作负荷 排队论 

分 类 号:F274[经济管理—企业管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象